Simulation of liquid metal logistics in primary aluminum industry

Production planning in the primary aluminum industry is a critical task, due to heavy imbalances among the main processes. As liquid production (reduction) has a very continuous and stable output, solidification at different lines have different operational paths (batch/continuous), shutdowns and va...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Pablo, D., Racca, P. P., Bustelo, C.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Production planning in the primary aluminum industry is a critical task, due to heavy imbalances among the main processes. As liquid production (reduction) has a very continuous and stable output, solidification at different lines have different operational paths (batch/continuous), shutdowns and variations in rates. Due to material's nature (hot liquid metal), it is not possible to maintain a buffer to absorb those imbalances. An adequate logistics planning for distributing liquid metal has to accomplish the solidification plan with an adequate usage of resources. In this paper we present the application of a simulation model to identify the main bottlenecks in the process, analyze dynamic system behavior, apply heuristics balancing algorithms and validate possible solutions for increasing casting capacity. The simulation model was implemented at Aluar's plant.
ISSN:0891-7736
1558-4305
DOI:10.1109/WSC.2012.6464984