A flat panel display upgrade solution replaces military CRT technology

Successful technology insertion programs must satisfy many system constraints in order to incorporate new capabilities into aging avionics systems while meeting program cost requirements. Such constraints frequently include form, fit, and functional replacement specifications, as well as power and e...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Coker, B.L., Willis, M.J.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Successful technology insertion programs must satisfy many system constraints in order to incorporate new capabilities into aging avionics systems while meeting program cost requirements. Such constraints frequently include form, fit, and functional replacement specifications, as well as power and electrical performance restrictions. This paper describes a technology insertion program undertaken by engineers at the Georgia Tech Research Institute. The program goal was to replace the 30-year-old azimuth indicator display of a radar warning receiver system. This necessitated the use of electroluminescent (EL) display technology to replace the analog cathode ray tube display currently used in the system. Because of the prohibitively high cost of aircraft wiring modifications, the replacement display was required to be completely form, fit, and functionally equivalent to its replacement. The form, fit, and functional equivalency requirement imposed the following system constraints: (1) power consumption of less than 10 Watts, (2) the need to maintain the same stroke-deflection current electrical interface, and (3) the need to meet the maintenance and repair budget of the existing display unit. Additional requirements included night-vision compatibility and full sunlight readability. The display was also required to be MIL-STD-1553 Remote Terminal communication capable. All of these requirements posed a challenging technology insertion problem to program personnel. The case study described in this paper illustrates the approach to meeting the particular requirements of this technology insertion program.
DOI:10.1109/DASC.1997.637227