Reliability value-based power system operation decision

The paper presents a scheme for evaluating and optimally enhancing system reliability for a short time horizon operation of one week. Power system reliability can be efficiently enhanced by applying appropriate remedial actions (RAs). This paper investigates the impact of remedial actions on system...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Momoh, J.A., Yanchun Wang, Elfayoumy, M., Mittelstadt, B.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The paper presents a scheme for evaluating and optimally enhancing system reliability for a short time horizon operation of one week. Power system reliability can be efficiently enhanced by applying appropriate remedial actions (RAs). This paper investigates the impact of remedial actions on system reliability, the corresponding associated cost and the amount of unserved energy using EPRI Transmission Reliability Evaluation for Large Scale System (TRELSS) program. The proposed scheme has been tested on IEEE 25 bus reliability test system.
ISSN:1062-922X
2577-1655
DOI:10.1109/ICSMC.1997.633187