Multi-time scales coordination scheduling of wind power integrated system

Coordination method between long-term and short-time generation scheduling of wind power integrated system are proposed. Long-term scheduling mainly solves unit maintenance scheduling and energy allocation among weeks, and short-term scheduling decides unit commitment and hourly power output. In ord...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Kui Wang, Buhan Zhang, Xiaoshan Wu, Jiajun Zhai, Wen Shao, Yao Duan
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Coordination method between long-term and short-time generation scheduling of wind power integrated system are proposed. Long-term scheduling mainly solves unit maintenance scheduling and energy allocation among weeks, and short-term scheduling decides unit commitment and hourly power output. In order to cope with the high uncertainty of wind power and load demand, dynamic rolling generation scheduling are implemented weekly based on the updated load and wind power prediction results. A modified IEEE 118-bus system is applied to test the proposed model.
ISSN:2378-8534
2378-8542
DOI:10.1109/ISGT-Asia.2012.6303174