A two-stage heuristic method for vulcanization production scheduling
There are more product specifications, great production and much equipment over the whole process of rubber tire vulcanization. Aiming at rubber tire vulcanization production scheduling single-process, parallel machines scheduling problem with special process constraint, a two-stage scheduling strat...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | There are more product specifications, great production and much equipment over the whole process of rubber tire vulcanization. Aiming at rubber tire vulcanization production scheduling single-process, parallel machines scheduling problem with special process constraint, a two-stage scheduling strategy of vulcanization production, the load distribution of equipment and operation plans sequencing, is proposed. Equipment load distribution model of vulcanization machine based on 0-1 integer programming is built and improved maximum elimination algorithm is proposed. Operative plan sorting model based on 0-1 integer programming is built and an optimal algorithm based on minimum delay time is proposed. The algorithm was tested by online data. Results show that the two-stage scheduling method can quickly workout the optimal scheduling planning of vulcanization, reduce the production cost, and improve productivity. The method will lay the firm groundwork for application to production process in the future. |
---|---|
ISSN: | 1948-9439 1948-9447 |
DOI: | 10.1109/CCDC.2011.5968846 |