Energy Saving Analysis of Air-conditioning System of an Existing Office Buildings in Shanghai

According to the present problems of existing office buildings using air source heat pump, countermeasures were brought forward to solve the problems, such as changing part of the present air source heat pumps to water-cooled cold water units, changing present units into new air source heat pumps an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Han Xing, Ma Kehua, Zhang Beihong
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:According to the present problems of existing office buildings using air source heat pump, countermeasures were brought forward to solve the problems, such as changing part of the present air source heat pumps to water-cooled cold water units, changing present units into new air source heat pumps and pump variable frequency renovation. According to the case study in this paper, the static return period are 2years, 5-7years and 1-4years for each measure.
ISSN:2157-1473
DOI:10.1109/ICMTMA.2011.299