Study regarding intelligent protection in low voltage supply and data transmission
Nowadays, construction of power line protection circuits for over-voltage and over-current are built with varistor and gas-discharge tubes around a fuse, which has a disconnection time of 200ms. The intelligent system proposed in this paper offering a real-time monitoring of the energy consumer is a...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Nowadays, construction of power line protection circuits for over-voltage and over-current are built with varistor and gas-discharge tubes around a fuse, which has a disconnection time of 200ms. The intelligent system proposed in this paper offering a real-time monitoring of the energy consumer is a faster way of disconnecting the load and has an important facility: it does not require human intervention for load reconnection. |
---|---|
DOI: | 10.1109/SIITME.2010.5653026 |