Study regarding intelligent protection in low voltage supply and data transmission

Nowadays, construction of power line protection circuits for over-voltage and over-current are built with varistor and gas-discharge tubes around a fuse, which has a disconnection time of 200ms. The intelligent system proposed in this paper offering a real-time monitoring of the energy consumer is a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Lozneanu, D, Ogrutan, P, Aciu, L E, Rosca, I
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Nowadays, construction of power line protection circuits for over-voltage and over-current are built with varistor and gas-discharge tubes around a fuse, which has a disconnection time of 200ms. The intelligent system proposed in this paper offering a real-time monitoring of the energy consumer is a faster way of disconnecting the load and has an important facility: it does not require human intervention for load reconnection.
DOI:10.1109/SIITME.2010.5653026