The costs of pre-building graphic in the construction project management is a very important job, based on neural network theory and the characteristics of the costs of building graphic, raised GA neural network to solve the cost of building graphic problem, applied BP network model and used GA to o...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The costs of pre-building graphic in the construction project management is a very important job, based on neural network theory and the characteristics of the costs of building graphic, raised GA neural network to solve the cost of building graphic problem, applied BP network model and used GA to optimize the weight based on BP algorithm. The calculation examples showed that the accuracy of the cost estimation met the requirements basically. |
---|---|
ISSN: | 2159-6026 |
DOI: | 10.1109/CMCE.2010.5610497 |