Optimization of asset management in high voltage substation based on equipment monitoring and power system operation
This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented. |
---|---|
ISSN: | 1089-084X |
DOI: | 10.1109/ELINSL.2010.5549579 |