Optimization of asset management in high voltage substation based on equipment monitoring and power system operation

This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Suzuki, Y, Kojima, H, Hayakawa, N, Endo, F, Okubo, H
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented.
ISSN:1089-084X
DOI:10.1109/ELINSL.2010.5549579