A Fuzzy Game Scheme for Unit Maintenance Scheduling with Uncertain Cost Factors
In a competitive electricity market, Gencos should schedule their generators' maintenance plan to maximize their profit. Many of previous works are concentrated on short term bidding strategies. Besides, in the mid-term plan, several items such as reliability, fuel, pollution, and risk constrai...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In a competitive electricity market, Gencos should schedule their generators' maintenance plan to maximize their profit. Many of previous works are concentrated on short term bidding strategies. Besides, in the mid-term plan, several items such as reliability, fuel, pollution, and risk constraints are considered. Unit Maintenance Scheduling (UMS) has a significant effect on the Genco's profit in a competitive electricity market. In a regulated power system, UMS is usually determined by a central system, such as System Operator (SO). On the other hand, in a de-regulated power system, UMS is determined through multiple interactions between the market players, mainly Gencos and SO. Considering these, it would be a desire to solve both short term and mid-term problems, in a single framework. In this case, Gencos can offer a price curve with an outlook to mid-term goals in a game-theoretic approach. The approach would be based on some predictions of parameters such as production cost factors. This article, addresses the uncertainty in the cost factors in a fuzzy game theoretic scheme and experimental results show the effectiveness of the proposed approach. |
---|---|
ISSN: | 2157-4839 |
DOI: | 10.1109/APPEEC.2010.5448405 |