Optimal Generator Start-Up Strategy for Power System Restoration

In an earlier EPRI project, the authors employed a knowledge-based system (KBS) to develop a tool to guide system operators to restart generators after a blackout. In this paper, the authors convert the KBS formulation into a Mixed Integer Quadratically Constrained Program (MIQCP) problem. Taking ad...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Wei Sun, Chen-Ching Liu, Chu, R.F.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In an earlier EPRI project, the authors employed a knowledge-based system (KBS) to develop a tool to guide system operators to restart generators after a blackout. In this paper, the authors convert the KBS formulation into a Mixed Integer Quadratically Constrained Program (MIQCP) problem. Taking advantage of the quasiconcave property of the generation ramping curves, an algorithm to solve the generator start-up sequence problem is proposed. The solution method breaks the restoration horizon into intervals and develops the restoration plan by finding the status of each generator at each time interval. Optimality is achieved at each step. The algorithm was tested using the PECO data from the EPRI project.
DOI:10.1109/ISAP.2009.5352958