Research on mixed scheduling algorithm in industrial process networked control systems

Based on the comprehensive scheduling index, a mixed scheduling algorithm is proposed for the problem that periodic tasks and non-periodic tasks share network resources in industrial process networked control systems. A network QoS estimator is used to acquire current network states. In order to imp...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Han, Pu, Li, Chao, Dong, Ze, Cui, Xiu Zheng
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Based on the comprehensive scheduling index, a mixed scheduling algorithm is proposed for the problem that periodic tasks and non-periodic tasks share network resources in industrial process networked control systems. A network QoS estimator is used to acquire current network states. In order to improve the network operational performance, mixed scheduling algorithm is adjusted online according to the current network status and comprehensive scheduling index. Both the mechanism analysis and simulation show that this algorithm has great real-time performance, low network packet loss and high average performance.
ISSN:1948-9439
1948-9447
DOI:10.1109/CCDC.2009.5192684