Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method
This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways' new energy management system. |
---|---|
DOI: | 10.1109/PICA.1995.515180 |