A scheduling problem language
A language for specification of the details of a scheduling problem is presented. First experiments indicate that the language can be used to express actual scheduling problems. Some deficiencies were detected but they can be fixed while keeping the general structure of the language.
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A language for specification of the details of a scheduling problem is presented. First experiments indicate that the language can be used to express actual scheduling problems. Some deficiencies were detected but they can be fixed while keeping the general structure of the language. |
---|---|
ISSN: | 1068-3070 2377-5998 |
DOI: | 10.1109/EMWRTS.1995.514292 |