Probabilistic Criterion for Expansion and Operation Planning

The Brazilian power grid has traditionally been designed and operated by means of a deterministic reliability criteria set. Although these criteria have successfully eliminated system constraints, they have also entailed higher costs, especially those concerning operation planning. That happens beca...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Lima, J.M., Schilling, M.T., Lourenco, E.M.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Brazilian power grid has traditionally been designed and operated by means of a deterministic reliability criteria set. Although these criteria have successfully eliminated system constraints, they have also entailed higher costs, especially those concerning operation planning. That happens because such deterministic criteria allow quantitative and not- qualitative analysis. Their essential weakness is that they cannot recognize the probabilistic or stochastic nature of system behavior, of customers demands, or of a component failures. This article illustrates how probabilistic criteria can replace the existing deterministic approach. Detailed reliability analyses of different load levels in the electric power system of Parana state, Brazil, are used as case study. The proposed approach seems promising in terms of reducing the cost for operation and long-term planning. On the other hand, the system risk level will not experience any significant increase.