Optimal preventive maintenance budget setting for electric power distribution utilities

This paper proposes a practical method of preventive maintenance budget setting for electric power distribution utilities. Power system reliability mainly depends on preventive maintenance programs including types and frequency of selected maintenance activities controlled by maintenance budgets. In...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Phoothong, N., Vanittanakom, P., Teera-achariyakul, N., Rerkpreedapong, D.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper proposes a practical method of preventive maintenance budget setting for electric power distribution utilities. Power system reliability mainly depends on preventive maintenance programs including types and frequency of selected maintenance activities controlled by maintenance budgets. In this paper, particle swarm optimization (PSO) is used to find the optimal budget settings in order to minimize the outage costs of electric utility customers. All of 10 distribution feeders at Bang-Wua (BWA) substation of the Provincial Electricity Authority of Thailand (PEA) are chosen to illustrate the proposed algorithm.
DOI:10.1109/ECTICON.2008.4600590