Los Alamos Proton Storage Ring Extraction System
The unprecedented peak and average proton currents and extraction rates from the Proton Storage Ring (PSR) under construction at the Los Alamos National Laboratory present new problems in beam extraction. Activation caused by beam spill must be minimal to permit hands-on maintenance. Timing requirem...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on nuclear science 1981-01, Vol.28 (3), p.2791-2793 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The unprecedented peak and average proton currents and extraction rates from the Proton Storage Ring (PSR) under construction at the Los Alamos National Laboratory present new problems in beam extraction. Activation caused by beam spill must be minimal to permit hands-on maintenance. Timing requirements are uncommonly stringent. Solutions to these problems are outlined below. |
---|---|
ISSN: | 0018-9499 1558-1578 |
DOI: | 10.1109/TNS.1981.4331914 |