Optimal Long Range hydro Scheduling in the Integrated Power System

The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power apparatus and systems 1978-01, Vol.PAS-97 (1), p.292-299
Hauptverfasser: Viramontes, F. A., Hamilton, H. B.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled down time for various unit maintenance activities, cost of operation for various valve loadings and stochastic river flow data are inputs to a program which yields hydro energy scheduling for most economic loading over the time frame.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1978.354480