Optimal Long Range hydro Scheduling in the Integrated Power System
The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power apparatus and systems 1978-01, Vol.PAS-97 (1), p.292-299 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled down time for various unit maintenance activities, cost of operation for various valve loadings and stochastic river flow data are inputs to a program which yields hydro energy scheduling for most economic loading over the time frame. |
---|---|
ISSN: | 0018-9510 2995-6323 |
DOI: | 10.1109/TPAS.1978.354480 |