A Practical Approach to an Interim Multi-Area Economic Dispatch Using Limited Computer Resources
A straight foward and computationally efficient method is presented for calculating and sending "economic" Area Control Error(ACE) signals to three operating companies in the Texas Utilities(T.U.) System. The method requires T.U. system ACE and each operating company's total generatio...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power apparatus and systems 1985-06, Vol.PAS-104 (6), p.1400-1404 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A straight foward and computationally efficient method is presented for calculating and sending "economic" Area Control Error(ACE) signals to three operating companies in the Texas Utilities(T.U.) System. The method requires T.U. system ACE and each operating company's total generation and then mathematically computes each area's desired generation. The difference between the desired generation and the actual generation for each area is it's economic ACE. |
---|---|
ISSN: | 0018-9510 2995-6323 |
DOI: | 10.1109/TPAS.1985.319244 |