New Edition of the Ukrainian Technical Electromagnetic Compatability Adequacy Confirmation Order

This report renders the ground of the necessity of the preparation of the new edition of the Technical Electromagnetic Compatibility Adequacy Confirmation Order (TEMCO), ratified in December, 31, 2003. The preparation of the new TEMCO edition is included in the standardization sheet of the Ministry...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Knyazyev, V.V., Kravchenko, V.I., Lisnoy, I.P., Katrosha, P.V., Melnik, S.G.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This report renders the ground of the necessity of the preparation of the new edition of the Technical Electromagnetic Compatibility Adequacy Confirmation Order (TEMCO), ratified in December, 31, 2003. The preparation of the new TEMCO edition is included in the standardization sheet of the Ministry of Industrial Policy of Ukraine. Preliminary results of the new TEMCO edition preparation produced by the task group, the authors of the report are affiliated with, will be put for discussion
DOI:10.1109/UWBUS.2006.307217