ITER remote maintenance
During the conceptual design activity (CDA) for the International Thermonuclear Experimental Reactor (ITER), a reactor design was established that emphasized performance of the individual systems in a minimum overall reactor size. The resulting high component density arrangement dictates including a...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | During the conceptual design activity (CDA) for the International Thermonuclear Experimental Reactor (ITER), a reactor design was established that emphasized performance of the individual systems in a minimum overall reactor size. The resulting high component density arrangement dictates including assembly and maintenance (A&M) considerations in the development of the configuration. The A&M task is complicated further since remote handling equipment will be required after the start of deuterium-tritium operations. During the CDA, the Assembly and Maintenance Design Unit addressed many aspects of an overall A&M system. The authors discuss the ITER A&M philosophy that evolved, describe the ITER configuration as it relates to maintenance, and describe the procedures and equipment required for specific maintenance operations. Change-out of the in-vessel divertors and blanket/shields modules is discussed in detail.< > |
---|---|
DOI: | 10.1109/FUSION.1991.218684 |