A new front-end for the LEP Injector Linac
For improved reliability, the front-end of the LEP (Large Electron Positron colliding beam accelerator) Injector Linac (LIL) has been replaced. The new system has been used for LEP runs since March of 1991. The experimental results presented show a significant improvement of beam characteristics. Th...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | For improved reliability, the front-end of the LEP (Large Electron Positron colliding beam accelerator) Injector Linac (LIL) has been replaced. The new system has been used for LEP runs since March of 1991. The experimental results presented show a significant improvement of beam characteristics. These results also agree well with those of the simulation programs.< > |
---|---|
DOI: | 10.1109/PAC.1991.165155 |