JINR tau-charm factory design considerations
Results of a JINR tau-charm conceptual study are given. The general considerations regarding the storage ring and accelerator complex in JINR, the tau-charm factory injector system and the main ring, the principles and the parameter estimation to achieve high luminosity are examined. The approximate...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Results of a JINR tau-charm conceptual study are given. The general considerations regarding the storage ring and accelerator complex in JINR, the tau-charm factory injector system and the main ring, the principles and the parameter estimation to achieve high luminosity are examined. The approximate cost of the tau-charm factory in JINR using the institute's infrastructure is 130 million rubles, 20.5 million being spent for civil engineering and installation works.< > |
---|---|
DOI: | 10.1109/PAC.1991.164245 |