Complex measures for loss reduction of 0.4 kWt electricity air line in the Gehr district and improvement of network mode
This document presents the determination of energy loss of 0.4 kV electricity airline in the Gehr district and complex measures against the energy losses. A special methodology to calculate network mode and the energy loss has been developed for 2, 3 and 4 wires electricity lines in the Gehr distric...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This document presents the determination of energy loss of 0.4 kV electricity airline in the Gehr district and complex measures against the energy losses. A special methodology to calculate network mode and the energy loss has been developed for 2, 3 and 4 wires electricity lines in the Gehr district as this network is considerably distinguished from the ordinary electricity network is made of wire without coat. We developed a project to build electricity network with coated cable in the Gehr district of Gobi-Altai and Bayankhongor aimags and we decided to establish this network only with 4 wires. As a result, all specifications of network modes have been improved and energy loss in the line has reduced by 3-4 times. Illegal use of electricity almost disappeared. |
---|---|
DOI: | 10.1109/KORUS.2004.1555354 |