Behavior of overhead transmission line parameters on the presence of ground wires
Initially this paper shows the ground wire reduction process for generic multiphase transmission lines and after, the ground wire reduction process for a specific 440-kV three-phase overhead transmission line. Following this, the influence of the ground wire reduction process considering two situati...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power delivery 2005-04, Vol.20 (2), p.1669-1676 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Initially this paper shows the ground wire reduction process for generic multiphase transmission lines and after, the ground wire reduction process for a specific 440-kV three-phase overhead transmission line. Following this, the influence of the ground wire reduction process considering two situations is shown: first, considering frequency independence and second, when these parameters are considered as frequency dependent. This paper presents analytical results for generic multiphase transmission lines. For a specific 440-kV three-phase overhead transmission line, analytical and graphic results are shown considering real data for every frequency between 10 Hz and 1 MHz. |
---|---|
ISSN: | 0885-8977 1937-4208 |
DOI: | 10.1109/TPWRD.2004.833916 |