A reliability-based approach to transmission maintenance planning and its application in BC hydro system

This paper presents a reliability-based method for transmission maintenance planning. A quantified impact assessment of the planned outage on operation reliability of the whole transmission system is a main feature of the proposed method. This reliability centered maintenance (RCM) approach for tran...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power delivery 2004-01, Vol.19 (1), p.303-308
Hauptverfasser: Wenyuan Li, Korczynski, J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a reliability-based method for transmission maintenance planning. A quantified impact assessment of the planned outage on operation reliability of the whole transmission system is a main feature of the proposed method. This reliability centered maintenance (RCM) approach for transmission systems provides not only the lowest risk maintenance schedule but also the most reliable operation mode for the planned outage. Another feature of the method is ease of incorporation into the existing traditional transmission maintenance procedure. A time-shift-based Monte Carlo simulation technique and a linear programming optimization model are used to perform reliability evaluation of the transmission system with planned outage(s). An example for the planned replacement of a 230-kV cable in the BC Hydro North Metro system has been given to demonstrate a practical application of the proposed procedure and the method.
ISSN:0885-8977
1937-4208
DOI:10.1109/TPWRD.2003.820183