Multi-Path Bound for DAG Tasks
This paper studies the response time bound of a DAG (directed acyclic graph) task. Recently, the idea of using multiple paths to bound the response time of a DAG task, instead of using a single longest path in previous results, was proposed and led to the so-called multi-path bound. Multi-path bound...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on computer-aided design of integrated circuits and systems 2024-11, p.1-1 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper studies the response time bound of a DAG (directed acyclic graph) task. Recently, the idea of using multiple paths to bound the response time of a DAG task, instead of using a single longest path in previous results, was proposed and led to the so-called multi-path bound. Multi-path bounds can greatly reduce the response time bound and significantly improve the schedulability of DAG tasks. This paper derives a new multi-path bound and proposes an optimal algorithm to compute this bound. We further present a systematic analysis on the dominance and the sustainability of three existing multi-path bounds and the proposed multi-path bound. Our bound theoretically dominates and empirically outperforms all existing multi-path bounds. What's more, the proposed bound is the only multi-path bound that is proved to be self-sustainable. |
---|---|
ISSN: | 0278-0070 |
DOI: | 10.1109/TCAD.2024.3507563 |