No-wait scheduling of a two-machine flow-shop to minimize the makespan under non-availability constraints and different release dates

In this paper, we consider the two-machine no-wait flow-shop scheduling problem, when every machine is subject to one non-availability constraint and jobs have different release dates. The non-availability intervals of the machines overlap and they are known in advance. We aim to find a non-resumabl...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2011, p.6273-6286
Hauptverfasser: Ben Chihaoui, Faten, Kacem, Imed, Hadj-Alouane, Atidel B., Dridi, Najoua, Rezg, Nidhal
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we consider the two-machine no-wait flow-shop scheduling problem, when every machine is subject to one non-availability constraint and jobs have different release dates. The non-availability intervals of the machines overlap and they are known in advance. We aim to find a non-resumable schedule that minimises the makespan. We propose several lower bounds and upper bounds. These bounding procedures are used in a branch-and-bound algorithm. Computational experiments are carried out on a large set of instances and the obtained results show the effectiveness of our method.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2010.531775