No-wait scheduling of a two-machine flow-shop to minimize the makespan under non-availability constraints and different release dates
In this paper, we consider the two-machine no-wait flow-shop scheduling problem, when every machine is subject to one non-availability constraint and jobs have different release dates. The non-availability intervals of the machines overlap and they are known in advance. We aim to find a non-resumabl...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2011, p.6273-6286 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, we consider the two-machine no-wait flow-shop scheduling problem, when every machine is subject to one non-availability constraint and jobs have different release dates. The non-availability intervals of the machines overlap and they are known in advance. We aim to find a non-resumable schedule that minimises the makespan. We propose several lower bounds and upper bounds. These bounding procedures are used in a branch-and-bound algorithm. Computational experiments are carried out on a large set of instances and the obtained results show the effectiveness of our method. |
---|---|