Participatory foresight to address long-term issues in a large irrigation scheme. An example in Office du Niger, Mali
•Investment projects in irrigable land have been developed at large scale in West Africa since 2008.•Expansion of irrigation systems requires a foresight study at the whole territory scale.•Stakeholders’ diverse perceptions of the current situation led to different foresights.•Current land tensions...
Gespeichert in:
Veröffentlicht in: | Land use policy 2017-05, Vol.64, p.13-28 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | •Investment projects in irrigable land have been developed at large scale in West Africa since 2008.•Expansion of irrigation systems requires a foresight study at the whole territory scale.•Stakeholders’ diverse perceptions of the current situation led to different foresights.•Current land tensions can become major future social and institutional issues. |
---|---|
ISSN: | 0264-8377 1873-5754 |
DOI: | 10.1016/j.landusepol.2017.01.043 |