Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
In this paper, we study the identical parallel machine scheduling problem with a planned maintenance period on each machine to minimize the sum of completion times. This paper is a first approach for this problem. We propose three exact methods to solve the problem at hand: mixed integer linear prog...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 2009-09, Vol.197 (3), p.1150-1165 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, we study the identical parallel machine scheduling problem with a planned maintenance period on each machine to minimize the sum of completion times. This paper is a first approach for this problem. We propose three exact methods to solve the problem at hand: mixed integer linear programming methods, a dynamic programming based method and a branch-and-bound method. Several constructive heuristics are proposed. A lower bound, dominance properties and two branching schemes for the branch-and-bound method are presented. Experimental results show that the methods can give satisfactory solutions. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2008.03.043 |