Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times

In this paper, we study the identical parallel machine scheduling problem with a planned maintenance period on each machine to minimize the sum of completion times. This paper is a first approach for this problem. We propose three exact methods to solve the problem at hand: mixed integer linear prog...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 2009-09, Vol.197 (3), p.1150-1165
Hauptverfasser: Mellouli, Racem, Sadfi, Chérif, Chu, Chengbin, Kacem, Imed
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we study the identical parallel machine scheduling problem with a planned maintenance period on each machine to minimize the sum of completion times. This paper is a first approach for this problem. We propose three exact methods to solve the problem at hand: mixed integer linear programming methods, a dynamic programming based method and a branch-and-bound method. Several constructive heuristics are proposed. A lower bound, dominance properties and two branching schemes for the branch-and-bound method are presented. Experimental results show that the methods can give satisfactory solutions.
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2008.03.043