Approximation Schemes for Minimizing the Maximum Lateness on a Single Machine with Release Times Under Non-availability or Deadline Constraints
In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto frontier with respect to the two objective functions maximu...
Gespeichert in:
Veröffentlicht in: | Algorithmica 2018-12, Vol.80 (12), p.3825-3843 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto frontier with respect to the two objective functions maximum lateness and makespan. The third problem is associated with a non-availability constraint. In the fourth one, the non-availability interval is related to the operator who is organizing the execution of jobs on the machine (no job can start, and neither can complete during the operator non-availability period). For each of the four problems, we establish the existence of a polynomial time approximation scheme. |
---|---|
ISSN: | 0178-4617 1432-0541 |
DOI: | 10.1007/s00453-018-0417-6 |