An Integrated Production and Maintenance Planning Model with time windows and shortage cost

We present in this paper a problem combining two planning problems studied in the literature: the problem of capacitated lot sizing with shortage cost and the problem of determining optimal maintenance cycle. The aim of our study is to build a new model of joint planning of production and maintenanc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IFAC Proceedings Volumes 2009, Vol.42 (4), p.822-827
Hauptverfasser: selsouli, M. Alaoui, Najib, N.M., Mohafid, A., Aghezzaf, E.H.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We present in this paper a problem combining two planning problems studied in the literature: the problem of capacitated lot sizing with shortage cost and the problem of determining optimal maintenance cycle. The aim of our study is to build a new model of joint planning of production and maintenance where preventive maintenance tasks are carried out in time windows to better meet customer demand. We provide an illustrative example that show the effectiveness of integrated model if we compare it to separate model.
ISSN:1474-6670
2589-3653
DOI:10.3182/20090603-3-RU-2001.0458