Scheduling evacuation operations

In this paper, we consider a large-scale evacuation problem after a major disaster. The evacuation is assumed to occur by means of a fleet of buses, thus leading to scheduling the evacuation operations by buses [(bus evacuation problem (BEP)]. We propose time-indexed formulations as well as heuristi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of scheduling 2016-08, Vol.19 (4), p.467-478
Hauptverfasser: Deghdak, Kaouthar, T’kindt, Vincent, Bouquard, Jean-Louis
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we consider a large-scale evacuation problem after a major disaster. The evacuation is assumed to occur by means of a fleet of buses, thus leading to scheduling the evacuation operations by buses [(bus evacuation problem (BEP)]. We propose time-indexed formulations as well as heuristic algorithms such as greedy algorithms and a matheuristic. This matheuristic uses the former formulation to improve the best solution obtained by the greedy heuristics. In computational experiments, we analyze and evaluate the efficiency of the proposed solution algorithms.
ISSN:1094-6136
1099-1425
DOI:10.1007/s10951-015-0461-x