Scheduling evacuation operations
In this paper, we consider a large-scale evacuation problem after a major disaster. The evacuation is assumed to occur by means of a fleet of buses, thus leading to scheduling the evacuation operations by buses [(bus evacuation problem (BEP)]. We propose time-indexed formulations as well as heuristi...
Gespeichert in:
Veröffentlicht in: | Journal of scheduling 2016-08, Vol.19 (4), p.467-478 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, we consider a large-scale evacuation problem after a major disaster. The evacuation is assumed to occur by means of a fleet of buses, thus leading to scheduling the evacuation operations by buses [(bus evacuation problem (BEP)]. We propose time-indexed formulations as well as heuristic algorithms such as greedy algorithms and a matheuristic. This matheuristic uses the former formulation to improve the best solution obtained by the greedy heuristics. In computational experiments, we analyze and evaluate the efficiency of the proposed solution algorithms. |
---|---|
ISSN: | 1094-6136 1099-1425 |
DOI: | 10.1007/s10951-015-0461-x |