Upstream Discharge Distribution in Compound-Channel Flumes

Common inlet design for compound-channel flumes does not ensure a proper upstream discharge distribution. As the total head in the upstream tank is the same for both main-channel and floodplain subsections, the velocity in the upstream section is also the same in both subsections. The floodplain dis...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of hydraulic engineering (New York, N.Y.) N.Y.), 2005-05, Vol.131 (5), p.408-412
Hauptverfasser: Bousmar, D, Rivière, N, Proust, S, Paquier, A, Morel, R, Zech, Y
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Common inlet design for compound-channel flumes does not ensure a proper upstream discharge distribution. As the total head in the upstream tank is the same for both main-channel and floodplain subsections, the velocity in the upstream section is also the same in both subsections. The floodplain discharge is therefore too large and a mass transfer towards the main channel occurs along the flume. This Technical Note investigates how long a compound-channel flume must be to ensure that equilibrium between subsection discharges is achieved. The required length is found to be significant compared to the actual length of experimental flumes reported in the literature.
ISSN:0733-9429
1943-7900
DOI:10.1061/(ASCE)0733-9429(2005)131:5(408)