Heuristic procedures for solving the general assembly line balancing problem with setups
The general assembly line balancing problem with setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical simple assembly line balancing problem (SALBP) as follows: whenever a task is assigned next to another at the same workstatio...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2010-01, Vol.48 (6), p.1787-1804 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The general assembly line balancing problem with setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical simple assembly line balancing problem (SALBP) as follows: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time, thereby providing the task sequence inside each workstation. This paper proposes heuristic procedures, based on priority rules, for solving GALBPS, many of which are an improvement upon heuristic procedures published to date. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207540802577979 |