Modeling and Solving the Train Timetabling Problem

The train timetabling problem aims at determining a periodic timetable for a set of trains that does not violate track capacities and satisfies some operational constraints. In particular, we concentrate on the problem of a single, one-way track linking two major stations, with a number of intermedi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Operations research 2002-09, Vol.50 (5), p.851-861
Hauptverfasser: Caprara, Alberto, Fischetti, Matteo, Toth, Paolo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The train timetabling problem aims at determining a periodic timetable for a set of trains that does not violate track capacities and satisfies some operational constraints. In particular, we concentrate on the problem of a single, one-way track linking two major stations, with a number of intermediate stations in between. Each train connects two given stations along the track (possibly different from the two major stations) and may have to stop for a minimum time in some of the intermediate stations. Trains can overtake each other only in correspondence of an intermediate station, and a minimum time interval between two consecutive departures and arrivals of trains in each station is specified. In this paper, we propose a graph theoretic formulation for the problem using a directed multigraph in which nodes correspond to departures/arrivals at a certain station at a given time instant. This formulation is used to derive an integer linear programming model that is relaxed in a Lagrangian way. A novel feature of our model is that the variables in the relaxed constraints are associated only with nodes (as opposed to arcs) of the aforementioned graph. This allows a considerable speed-up in the solution of the relaxation. The relaxation is embedded within a heuristic algorithm which makes extensive use of the dual information associated with the Lagrangian multipliers. We report extensive computational results on real-world instances provided from Ferrovie dello Stato SpA, the Italian railway company, and from Ansaldo Segnalamento Ferroviario SpA.
ISSN:0030-364X
1526-5463
DOI:10.1287/opre.50.5.851.362