Grouted gravel column-supported highway embankment over soft clay: case study

In this paper, a simplified column construction method — the so-called grouted gravel column — and its application to construction of embankments over soft ground are introduced. The construction method, quality assurance (QA), and quality control (QC) of the grouted gravel columns are described. A...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Canadian geotechnical journal 2015-11, Vol.52 (11), p.1725-1733
Hauptverfasser: Liu, Hanlong, Kong, Gangqiang, Chu, Jian, Ding, Xuanming
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!