SYNCHRONOUS RAPID CONSTRUCTION METHOD FOR CONCURRENT CONSTRUCTION OF NAVIGATION LOCK AND WATER GATE IN CURVED CHANNEL
Provided in the present invention is a synchronous rapid construction method for concurrent construction of a navigation lock and a water gate in a curved channel. The synchronous rapid construction method comprises the following steps: S1, at the end of the wet season, excavating an open diversion...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Provided in the present invention is a synchronous rapid construction method for concurrent construction of a navigation lock and a water gate in a curved channel. The synchronous rapid construction method comprises the following steps: S1, at the end of the wet season, excavating an open diversion ditch, synchronously excavating a foundation pit for a navigation lock which is not on a natural channel, and constructing the navigation lock; S2, constructing a steel trestle bridge for transportation; S3, in the early stage of the dry season, closing the natural channel by using an earth-rockfill cofferdam upstream of the water gate and an earth-rockfill cofferdam downstream of the water gate, and using the open diversion ditch for the travelling of water; S4, rapidly constructing the water gate on the closed natural channel, wherein the water gate is built close to two side portions of the natural channel; S5, before the next year's flood season, breaching the earth-rockfill cofferdam upstream of the water gate |
---|