COMPREHENSIVE OPERATION TROLLEY FOR CONSTRUCTION OF AIR-CUSHION SURGE CHAMBER OF HYDROPOWER STATION, AND USING METHOD THEREOF

A comprehensive operation trolley for construction of an air-cushion surge chamber of a hydropower station, and a using method thereof, the comprehensive operation trolley comprising a rack system (1) used for supporting the whole trolley. A translation system (6) used for driving the rack system to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIANG, Shouguo, QI, Xuechun, SU, Weiyuan, XU, Feng, SHE, Weiwei, QIN, Mingyong, LI, Pengyu, CHEN, Shuai, WANG, Zhenghui, ZHOU, Dezhi, WANG, Zongmin, SUN, Jianbin, ZHOU, Zepei, WANG, Xiaodong, ZHAO, Dongbo, XU, Weijie
Format: Patent
Sprache:chi ; eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A comprehensive operation trolley for construction of an air-cushion surge chamber of a hydropower station, and a using method thereof, the comprehensive operation trolley comprising a rack system (1) used for supporting the whole trolley. A translation system (6) used for driving the rack system to move and travel along a surge chamber (20) is installed at the bottom of the rack system (1) in a fitting manner; a top arch system (3) used for auxiliary construction of a vault of the surge chamber (20) is arranged at a top end of the rack system (1); a plurality of sliding form systems (2) used for lining construction of an inner side wall of the surge chamber (20) are symmetrically arranged on two outer sides of the rack system (1); a plurality of lifting systems (4) used for lifting operations are arranged on the two outer sides of the rack system (1); and the translation system (6), the top arch system (3) and the sliding form systems (2) are connected to a hydraulic system (5) used for controlling the actio