FACILITY DEVELOPMENT PLANNING AND COST ESTIMATION

A method includes receiving input data representing element-level parameters of a project, generating normalized data by normalizing the input data to a neutral reference plane, normalizing including normalizing the element-level parameters based on at least one of transport data, location data, ins...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: VHANAMANE, Ranjit Ramchandra, LUCAS-CLEMENTS, Daniel Colin Nesbitt, FLEITAS CALZADILLA, Patricia Alejandra, HUDSON, Nicholas
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method includes receiving input data representing element-level parameters of a project, generating normalized data by normalizing the input data to a neutral reference plane, normalizing including normalizing the element-level parameters based on at least one of transport data, location data, installation data, or time data, adding the normalized data to a database of element-level parameter data, and adjusting one or more parameter curves using the database to which the normalized data was added. Un procédé comprend la réception de données d'entrée représentant des paramètres de niveau élément d'un projet, la génération de données normalisées par normalisation des données d'entrée à un plan de référence neutre, la normalisation comprenant la normalisation des paramètres de niveau élément sur la base de données de transport, de données d'emplacement, de données d'installation et/ou de données de temps, l'ajout des données normalisées à une base de données de données de paramètre de niveau élément, et l'ajustement d'une ou de plusieurs courbes de paramètre à l'aide de la base de données à laquelle les données normalisées ont été ajoutées.