FABRICATED RAPID CONSTRUCTION PLATFORM FOR BRIDGE AND CONTROL METHOD THEREFOR

A fabricated rapid construction platform for a bridge, wherein the construction platform comprises a fixing frame, an upper-layer tubular pile position control structure (6), a lower-layer tubular pile position control structure (7), and a console; the fixing frame comprises a bottom rail platform (...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHUO, Xiaoli, YANG, Yuhou, WANG, Hua, LUO, Jizhi, WANG, Longlin, CHEN, Jipeng, LI, Litao, CHEN, Jianheng, QIU, Bo, HAO, Tianzhi, YU, Mengsheng, HUANG, Kainan, LI, Zengke, WANG, Xirui, LIU, Shijian, WEI, Gangrong
Format: Patent
Sprache:chi ; eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A fabricated rapid construction platform for a bridge, wherein the construction platform comprises a fixing frame, an upper-layer tubular pile position control structure (6), a lower-layer tubular pile position control structure (7), and a console; the fixing frame comprises a bottom rail platform (1), supporting posts (3), a top operation platform (2), and several supporting legs (4); the upper-layer tubular pile position control structure (6) and the lower-layer tubular pile position control structure (7) are provided between the bottom rail platform (1) and the top operation platform (2); the upper-layer tubular pile position control structure (6) comprises two sub-structures arranged symmetrically about the central axis of a second through hole, and each sub-structure comprises a braking device (61), a vertical control arm (63), and a horizontal control arm (62); and the lower-layer tubular pile position control structure (7) comprises an annular frame (71), a revolution driving device, and four lower con