AUTOMATED AND SYNCHRONIZED CONTROL SYSTEM FOR BUNDLED STEEL STRAND ANCHORING

An automated and synchronized control system for bundled steel strand anchoring. The system is provided with a pre-tensioning device, an integrated tensioning device, a hydraulic pump station, and a main control center. Each part is organically connected via high pressure hydraulic tubing, a data tr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIANG, Fulei, TANG, Zuwen, HUANG, Zhenglong, HE, Jintao, YANG, Xiangui, WEI, Xueying, XIAO, Yun, WU, Songlin, LUO, Yizhong, LI, Jianlan, YU, Jinyong, FENG, Biao, FENG, Dakang, CHEN, Lingbing, TANG, Yaqi, LIU, Cheng, ZENG, Shirong
Format: Patent
Sprache:chi ; eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An automated and synchronized control system for bundled steel strand anchoring. The system is provided with a pre-tensioning device, an integrated tensioning device, a hydraulic pump station, and a main control center. Each part is organically connected via high pressure hydraulic tubing, a data transmission cable, and a control component. The main control center issues a command and the hydraulic pump station then actuates the pre-tensioning device and integrated tensioning device to perform a tensioning operation in accordance with a pre-configured program. An integrated multi-piston, single-shaft pre-tensioning jack comprises a hydraulic cylinder and a piston. The hydraulic cylinder is provided with multiple piston openings. Each of the pistons is installed within a piston opening to form an integrated multi-piston structure. By using the pre-tensioning jack with a structure comprising a single hydraulic cylinder and multiple pistons a high degree of integration is achieved. The invention can realize simu