MULTI-CORE DYNAMIC WORKLOAD MANAGEMENT
A dynamic scheduler is provided that schedules tasks (200) for a plurality of cores based upon current operating characteristics for the cores (210, 225, 305). The current operating characteristics include a predicted leakage current for each core based upon an analytical model. L'invention con...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A dynamic scheduler is provided that schedules tasks (200) for a plurality of cores based upon current operating characteristics for the cores (210, 225, 305). The current operating characteristics include a predicted leakage current for each core based upon an analytical model.
L'invention concerne un planificateur dynamique qui planifie des tâches (200) pour une pluralité de cœurs sur la base de caractéristiques de fonctionnement courantes des cœurs (210, 225, 305). Parmi les caractéristiques de fonctionnement courantes, on peut citer un courant de fuite prévu pour chaque cœur sur la base d'un modèle analytique. |
---|