TENSION-MOORED FLOATING BODY AND METHOD FOR TOWING AND INSTALLING TENSION-MOORED FLOATING BODY
Provided is a tension-moored floating body and a method for towing and installing the tension-moored floating body by which the static restoring force of the tension-moored floating body can be increased when towing and installing the tension-moored floating body so as to assure its stability, and t...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Provided is a tension-moored floating body and a method for towing and installing the tension-moored floating body by which the static restoring force of the tension-moored floating body can be increased when towing and installing the tension-moored floating body so as to assure its stability, and the required large-scale marine performance and usage frequency can be reduced as a result. Furthermore, operations for attaching tension-mooring cables and adjusting their lengths can be performed above the water level during installation and after installation. With a tension-moored floating body (1), with which a floating body (12) that consists of a columnar body (12a) that passes through the water surface (3) and a submersed floating body (12b), and lower mooring parts (14c), that are installed at the bottom of the body of water (2), are connected together using multiple tension-mooring cables (13), tension is applied to the aforementioned tension-mooring cables (13) in order to hold the position. The floating body is configured such that mooring members (15) with floating parts (15a) that pass through the water surface are provided connected to the aforementioned submersed floating body (12b), and the upper ends of the aforementioned tension-mooring cables (13) are fixed to upper mooring parts (15c) that are provided on the aforementioned mooring members (15) at positions above the water level.
L'invention concerne un corps flottant amarré par tension et un procédé de traction et d'installation dudit corps flottant amarré par tension, par lequel la force de rétablissement statique du corps flottant amarré par tension peut être accrue lors de la traction et de l'installation dudit corps flottant amarré par tension, de façon à assurer sa stabilité, et lesdites performances marines à grande échelle requises et la fréquence d'utilisation peuvent être réduites en conséquence. En outre, les opérations pour fixer les câbles d'amarrage par tension et ajuster leurs longueurs peuvent être réalisées au-dessus du niveau de l'eau pendant l'installation et après l'installation. Avec un corps flottant amarré par tension (1), avec lequel un corps flottant (12) constitué d'un corps colonnaire (12a) qui passe à travers la surface de l'eau (3) et un corps flottant submergé (12b), et des pièces d'amarrage inférieures (14c), qui sont installées dans le bas du corps d'eau (2), sont reliés ensemble en utilisant de multiples câbles d'amarrage par tension (13), une tension est appl |
---|