DAMMING METHOD FOR PERMEABLE RED MUD DAM WITH RED MUD FROM SINTERING PROCESS
A damming method for permeable red mud dam with red mud from sintering process comprises the following steps: building the dam body (1) of a red mud dam with red mud from sintering process layer by layer using hydraulic filling; laying drainage devices (2) in the dam body (1) at intervals as the dam...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A damming method for permeable red mud dam with red mud from sintering process comprises the following steps: building the dam body (1) of a red mud dam with red mud from sintering process layer by layer using hydraulic filling; laying drainage devices (2) in the dam body (1) at intervals as the dam rises.
L'invention concerne un procédé de construction de digue de boues rouges perméables provenant d'un procédé de frittage, qui comporte les étapes suivantes: construire un corps de digue (1) de boues rouges à l'aide de boues rouges provenant d'un procédé de frittage, couche après couche, par remplissage hydraulique; mettre en place des dispositifs de drainage (2) dans le corps de digue (1) par intervalles, à mesure que la digue est érigée. |
---|