A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION

For reducing measurement operations for a pier foundation there is measured a position determined by a horizontal measurement point, where a positioning rod (2) is struck in the ground. Thereafter, a base plate (31), which is for the sleeve (4) and provided with hole (32), is placed against the grou...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NAERHI, ERKKI, TANHUANPAEAE, JANNE
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NAERHI, ERKKI
TANHUANPAEAE, JANNE
description For reducing measurement operations for a pier foundation there is measured a position determined by a horizontal measurement point, where a positioning rod (2) is struck in the ground. Thereafter, a base plate (31), which is for the sleeve (4) and provided with hole (32), is placed against the ground such that the rod goes through the hole, and consequently, thanks to the rod measured in place and the hole in the base plate, the lower part of the sleeve is in a correct position. When a foundation pier is cast, it will suffice to make sure with a builder's level, for instance, that the sleeve is upright. Hence, the upper end of the foundation pier is also in a correct position horizontally. Dans le but de réduire les opérations de mesure associées à une fondation par pilier, l'invention concerne un procédé consistant à mesurer une position déterminée par un point de mesure horizontal au niveau duquel une tige de repérage (2) est enfoncée dans le sol ; à placer ensuite contre le sol une semelle (31) adaptée à un manchon (4) et pourvue d'un trou (32), de façon à ce que la tige traverse le trou. La tige mesurée et le trou ménagé dans la semelle assurent donc un positionnement correct de la partie inférieure du manchon. Lors du coulage du pilier de fondation, il suffit de vérifier, par exemple à l'aide d'un niveau, que le manchon est bien vertical, ce qui indique que l'extrémité supérieure du pilier de fondation occupe une position horizontale.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_WO2007113384A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>WO2007113384A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_WO2007113384A13</originalsourceid><addsrcrecordid>eNrjZChxVAjwdA1ScAwOdvV18onUUYAKuPmH-rk4hnj6-yk4BgU5-rm7-rr6hSg4-rkAVfi6hnj4uwDVBCkEBPmHebp4-rnDNEJUuPn7h4AEQUowTORhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfHh_kYGBuaGhsbGFiaOhsbEqQIA7vY4tg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION</title><source>esp@cenet</source><creator>NAERHI, ERKKI ; TANHUANPAEAE, JANNE</creator><creatorcontrib>NAERHI, ERKKI ; TANHUANPAEAE, JANNE</creatorcontrib><description>For reducing measurement operations for a pier foundation there is measured a position determined by a horizontal measurement point, where a positioning rod (2) is struck in the ground. Thereafter, a base plate (31), which is for the sleeve (4) and provided with hole (32), is placed against the ground such that the rod goes through the hole, and consequently, thanks to the rod measured in place and the hole in the base plate, the lower part of the sleeve is in a correct position. When a foundation pier is cast, it will suffice to make sure with a builder's level, for instance, that the sleeve is upright. Hence, the upper end of the foundation pier is also in a correct position horizontally. Dans le but de réduire les opérations de mesure associées à une fondation par pilier, l'invention concerne un procédé consistant à mesurer une position déterminée par un point de mesure horizontal au niveau duquel une tige de repérage (2) est enfoncée dans le sol ; à placer ensuite contre le sol une semelle (31) adaptée à un manchon (4) et pourvue d'un trou (32), de façon à ce que la tige traverse le trou. La tige mesurée et le trou ménagé dans la semelle assurent donc un positionnement correct de la partie inférieure du manchon. Lors du coulage du pilier de fondation, il suffit de vérifier, par exemple à l'aide d'un niveau, que le manchon est bien vertical, ce qui indique que l'extrémité supérieure du pilier de fondation occupe une position horizontale.</description><language>eng ; fre</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071011&amp;DB=EPODOC&amp;CC=WO&amp;NR=2007113384A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071011&amp;DB=EPODOC&amp;CC=WO&amp;NR=2007113384A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NAERHI, ERKKI</creatorcontrib><creatorcontrib>TANHUANPAEAE, JANNE</creatorcontrib><title>A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION</title><description>For reducing measurement operations for a pier foundation there is measured a position determined by a horizontal measurement point, where a positioning rod (2) is struck in the ground. Thereafter, a base plate (31), which is for the sleeve (4) and provided with hole (32), is placed against the ground such that the rod goes through the hole, and consequently, thanks to the rod measured in place and the hole in the base plate, the lower part of the sleeve is in a correct position. When a foundation pier is cast, it will suffice to make sure with a builder's level, for instance, that the sleeve is upright. Hence, the upper end of the foundation pier is also in a correct position horizontally. Dans le but de réduire les opérations de mesure associées à une fondation par pilier, l'invention concerne un procédé consistant à mesurer une position déterminée par un point de mesure horizontal au niveau duquel une tige de repérage (2) est enfoncée dans le sol ; à placer ensuite contre le sol une semelle (31) adaptée à un manchon (4) et pourvue d'un trou (32), de façon à ce que la tige traverse le trou. La tige mesurée et le trou ménagé dans la semelle assurent donc un positionnement correct de la partie inférieure du manchon. Lors du coulage du pilier de fondation, il suffit de vérifier, par exemple à l'aide d'un niveau, que le manchon est bien vertical, ce qui indique que l'extrémité supérieure du pilier de fondation occupe une position horizontale.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZChxVAjwdA1ScAwOdvV18onUUYAKuPmH-rk4hnj6-yk4BgU5-rm7-rr6hSg4-rkAVfi6hnj4uwDVBCkEBPmHebp4-rnDNEJUuPn7h4AEQUowTORhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfHh_kYGBuaGhsbGFiaOhsbEqQIA7vY4tg</recordid><startdate>20071011</startdate><enddate>20071011</enddate><creator>NAERHI, ERKKI</creator><creator>TANHUANPAEAE, JANNE</creator><scope>EVB</scope></search><sort><creationdate>20071011</creationdate><title>A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION</title><author>NAERHI, ERKKI ; TANHUANPAEAE, JANNE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_WO2007113384A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2007</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NAERHI, ERKKI</creatorcontrib><creatorcontrib>TANHUANPAEAE, JANNE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NAERHI, ERKKI</au><au>TANHUANPAEAE, JANNE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION</title><date>2007-10-11</date><risdate>2007</risdate><abstract>For reducing measurement operations for a pier foundation there is measured a position determined by a horizontal measurement point, where a positioning rod (2) is struck in the ground. Thereafter, a base plate (31), which is for the sleeve (4) and provided with hole (32), is placed against the ground such that the rod goes through the hole, and consequently, thanks to the rod measured in place and the hole in the base plate, the lower part of the sleeve is in a correct position. When a foundation pier is cast, it will suffice to make sure with a builder's level, for instance, that the sleeve is upright. Hence, the upper end of the foundation pier is also in a correct position horizontally. Dans le but de réduire les opérations de mesure associées à une fondation par pilier, l'invention concerne un procédé consistant à mesurer une position déterminée par un point de mesure horizontal au niveau duquel une tige de repérage (2) est enfoncée dans le sol ; à placer ensuite contre le sol une semelle (31) adaptée à un manchon (4) et pourvue d'un trou (32), de façon à ce que la tige traverse le trou. La tige mesurée et le trou ménagé dans la semelle assurent donc un positionnement correct de la partie inférieure du manchon. Lors du coulage du pilier de fondation, il suffit de vérifier, par exemple à l'aide d'un niveau, que le manchon est bien vertical, ce qui indique que l'extrémité supérieure du pilier de fondation occupe une position horizontale.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre
recordid cdi_epo_espacenet_WO2007113384A1
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title A PIER ASSEMBLY, A PIER FOUNDATION ARRANGEMENT AND A METHOD FOR PROVIDING A PIER AND A FOOTING FOR A PIER FOUNDATION
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T06%3A58%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NAERHI,%20ERKKI&rft.date=2007-10-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EWO2007113384A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true