Method for the assembly of frustoconical concrete towers and concrete tower assembled using said method
The present invention relates to a method for the assembly of frustoconical concrete towers comprising a step of placing and positioning of at least one subset of a tower section formed by at least two segments in an area close to the base of the tower, a step of assembling the subset of the tower s...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention relates to a method for the assembly of frustoconical concrete towers comprising a step of placing and positioning of at least one subset of a tower section formed by at least two segments in an area close to the base of the tower, a step of assembling the subset of the tower section by attaching at least two segments, so that the assembled subset is freestanding and a step of stacking the assembled subset onto an immediately lower tower section. |
---|