Method and apparatus to optimize generator start delay and runtime following outage
A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, and automatically determine a generator initial start and restart time delay based at least on a prediction of when an elect...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, and automatically determine a generator initial start and restart time delay based at least on a prediction of when an electrical system within the facility needs to be cycled. |
---|