Job scheduling to maximize use of reusable resources and minimize resource deallocation
Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are scheduled. If reusable...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are scheduled. If reusable resources are available for the job, the job is assigned to those resources. Otherwise, a search is performed for a solution which minimizes the weight and number of reusable resources that are to be deallocated. |
---|