Development of actual risk costs based on estimated risk costs as well as probabilistic restriction of the actual risk costs
An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to be assessed. A risk costs interval is to be determined, which contains the actual risk costs with high probability. This is achieved by a regression of intuitive assignments to a straight line by an indirect linear regression by a non-linear regression in an intermediate diagram. |
---|