Development of actual risk costs based on estimated risk costs as well as probabilistic restriction of the actual risk costs

An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SUTOR ARIANE, MAECKEL OLIVER
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to be assessed. A risk costs interval is to be determined, which contains the actual risk costs with high probability. This is achieved by a regression of intuitive assignments to a straight line by an indirect linear regression by a non-linear regression in an intermediate diagram.